I-4 WB & EL WB over Division Avenue

0.2MI W/O SR-408 · County 095, Florida · Built 2020 · 6 Lanes · 82,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
750789
Year Built
2020
Length
70.5 m (231.3 ft)
Max Span
35.3 m
Width
40.4 m (132.5 ft)
Lanes
6
Daily Traffic
82,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.