SAN PABLO ROAD over NORTH OPEN CREEK

1.0 MI N OF JTB BLVD. · County 031, Florida · Built 2001 · 4 Lanes · 30,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
724391
Year Built
2001
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
30.7 m (100.7 ft)
Lanes
4
Daily Traffic
30,500
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.