SR-202 EB (JTB) over INTRACOASTAL WATERWAY
0.3 MI.E.OF SAN PABLO RD. · County 031, Florida · Built 1988 · 2 Lanes · 32,250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.257303, -81.429289
This bridge is in worse condition than 22% of bridges in County 031. The average bridge in Florida is 0 years old; this one is 38 years old.
Nearby Bridges
SR-202 WB (JTB) over INTRACOASTAL WATERWAY
Built 1979
SR-202 EB (JTB) over SAN PABLO RD.
Built 1979
SR-202 WB (JTB) over SAN PABLO RD.
Built 1979
SR-202 WB (JTB) over CUT CREEK BRANCH
Built 1978
SR-202 EB (JTB) over CUT CREEK BRANCH
Built 1988
SAN PABLO ROAD over SOUTH OPEN CREEK
Built 2001
SAN PABLO ROAD over NORTH OPEN CREEK
Built 2001
SR-202 EB (JTB) over CUT CREEK TRIBUTARY
Built 1978
SR-202 WB (JTB) over CUT CREEK TRIBUTARY
Built 1978
COASTAL VIEW DRIVE over BEAMER CANAL
Built 2016
Bridge Details
- Structure #
- 720509
- Year Built
- 1988
- Length
- 1400.3 m (4594.2 ft)
- Max Span
- 42.7 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 32,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.