I-295 NB CD over RAMP EN

I-295 NB CD OVER RAMP EN · County 031, Florida · Built 2023 · 2 Lanes · 18,430 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
720852
Year Built
2023
Length
23.7 m (77.8 ft)
Max Span
23.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
18,430
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.