I-295 NB (SR-9A) over RAMP WS

I-295 NB/RAMP WS · County 031, Florida · Built 2023 · 2 Lanes · 32,250 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
720851
Year Built
2023
Length
24.5 m (80.4 ft)
Max Span
24.5 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
32,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.