SR-9B NB over I-295 NB (SR-9A)
SR-9B NB OVER I-295 NB · County 031, Florida · Built 2021 · 1 Lanes · 119,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.179722, -81.51375
This bridge is in worse condition than 15.2% of bridges in County 031. The average bridge in Florida is 0 years old; this one is 5 years old.
Nearby Bridges
I-295SB to SR-9BSB over I-295 NB Express
Built 2019
SR-9B SB over I-295 NB (SR-9A)
Built 2011
SR-9B NB over E-Town Parkway
Built 2012
SR-9B SB over E-Town Parkway
Built 2012
SR-9B SB over BIG DAVIS CREEK
Built 2012
SR-9B NB over BIG DAVIS CREEK
Built 2012
I-295 & US-1 RAMP over SWEETWATER CREEK
Built 2001
SR-9B SB over BIG DAVIS CREEK RELIEF
Built 2012
SR-9B NB over BIG DAVIS CREEK RELIEF
Built 2012
US-1 (SR-5) over SWEETWATER CREEK
Built 1934
Bridge Details
- Structure #
- 720834
- Year Built
- 2021
- Length
- 61.6 m (202.1 ft)
- Max Span
- 61.6 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 1
- Daily Traffic
- 119,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.