I-295SB to SR-9BSB over I-295 NB Express
SR-9B/Ramp A · County 031, Florida · Built 2019 · 2 Lanes · 28,250 vehicles/day
Overall
Deck
9
Excellent
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
30.180061, -81.513953
This bridge is in worse condition than 22% of bridges in County 031. The average bridge in Florida is 0 years old; this one is 7 years old.
Nearby Bridges
SR-9B NB over I-295 NB (SR-9A)
Built 2021
SR-9B SB over I-295 NB (SR-9A)
Built 2011
SR-9B NB over E-Town Parkway
Built 2012
SR-9B SB over E-Town Parkway
Built 2012
SR-9B SB over BIG DAVIS CREEK
Built 2012
SR-9B NB over BIG DAVIS CREEK
Built 2012
I-295 & US-1 RAMP over SWEETWATER CREEK
Built 2001
SR-9B SB over BIG DAVIS CREEK RELIEF
Built 2012
SR-9B NB over BIG DAVIS CREEK RELIEF
Built 2012
US-1 (SR-5) over SWEETWATER CREEK
Built 1934
Bridge Details
- Structure #
- 720833
- Year Built
- 2019
- Length
- 17.9 m (58.7 ft)
- Max Span
- 17.9 m
- Width
- 146.8 m (481.6 ft)
- Lanes
- 2
- Daily Traffic
- 28,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.