I-295 SB CD(SR-9A) over ORTEGA RIVER

I-295 SB (COLLECTOR RD.) · County 031, Florida · Built 2013 · 3 Lanes · 24,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
720751
Year Built
2013
Length
85.3 m (279.9 ft)
Max Span
35.4 m
Width
20.7 m (67.9 ft)
Lanes
3
Daily Traffic
24,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.