I-295 (SR-9A) NB over ORTEGA RIVER

I-295 (SR-9A) NB TO SR-21 · County 031, Florida · Built 2005 · 2 Lanes · 15,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
720708
Year Built
2005
Length
170.7 m (560 ft)
Max Span
36.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
15,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.