I-295 (SR-9A) SB over SWEETWATER CREEK

I-295 SB TO I-95 SB · County 031, Florida · Built 2005 · 1 Lanes · 19,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
720736
Year Built
2005
Length
16.7 m (54.8 ft)
Max Span
3 m
Lanes
1
Daily Traffic
19,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.