I-95 (SR-9) over SWEETWATER CREEK

I-295 SB Ramp to I-95 SB · County 031, Florida · Built 1966 · 14 Lanes · 100,362 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
720380
Year Built
1966
Reconstructed
2005
Length
11.1 m (36.4 ft)
Max Span
3.3 m
Lanes
14
Daily Traffic
100,362
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.