I-95 NB Ramp over Outfall Ditch

I-95 NB Off Ramp to SJP · County 009, Florida · Built 2019 · 1 Lanes · 800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
700242
Year Built
2019
Length
7.4 m (24.3 ft)
Max Span
2.3 m
Lanes
1
Daily Traffic
800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.