I-95 over Outfall
1.2 Mi S of Grant Rd · County 009, Florida · Built 1969 · 6 Lanes · 56,580 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
27.902842, -80.596519
This bridge is in worse condition than 27.2% of bridges in County 009. The average bridge in Florida is 0 years old; this one is 57 years old.
Nearby Bridges
I-95 over Outfall
Built 1969
St Johns Heritage over I-95
Built 2020
St.Johns Heritage over I-95
Built 2019
I-95 NB Ramp over Outfall Ditch
Built 2019
I-95 over Outfall Ditch
Built 1969
I-95 over Sottile Canal
Built 1969
I-95 over Sottile Canal
Built 1969
I-95 over Outfall
Built 1969
Grant Rd. over I-95
Built 1969
Babcock Street over Sebastian Canal
Built 1980
Bridge Details
- Structure #
- 700099
- Year Built
- 1969
- Reconstructed
- 2013
- Length
- 9.4 m (30.8 ft)
- Max Span
- 3 m
- Lanes
- 6
- Daily Traffic
- 56,580
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.