SR-528 over Banana River

0.7MI W OF SR-401 · County 009, Florida · Built 1963 · 2 Lanes · 17,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
700028
Year Built
1963
Length
339.8 m (1114.8 ft)
Max Span
26.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
17,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$239,000
Total Project Cost
$752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.