SR-528 over Banana River Relief

2.85 Miles East of SR-3 · County 009, Florida · Built 1963 · 2 Lanes · 13,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
700027
Year Built
1963
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
13,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$60,000
Total Project Cost
$752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.