PROPERTY ACCESS RO over LEVEE 28 CANAL
28.6 MILES EAST OF FL ROU · County 021, Florida · Built 1968 · 1 Lanes · 5 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
26.207361, -80.905833
This bridge is in worse condition than 77.1% of bridges in County 021. The average bridge in Florida is 0 years old; this one is 58 years old.
Nearby Bridges
PROPERTY ACCESS RO over LEVEE 28 CANAL
Built 1968
I-75 NB (SR-93) over Canal 030
Built 1990
I-75 NB (SR-93) over L-28 CANAL
Built 1990
I-75 SB (SR-93) over Canal 030
Built 1967
I-75 SB (SR-93) over L-28 CANAL
Built 1992
I-75 NB (SR-93) over Canal 029
Built 1990
I-75 SB (SR-93) over Canal 029
Built 1967
NB I-75 (SR-93) over Wildlife Crossing
Built 1988
SB I-75 (SR-93) over Wildlife Crossing
Built 1989
I-75 NB over WILDLIFE CROSSING NO. 35
Built 1990
Bridge Details
- Structure #
- 5120030S0000000
- Year Built
- 1968
- Length
- 63.1 m (207 ft)
- Max Span
- 10.7 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 5
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- National Park Service
- Last Inspected
- N/A
- Est. Improvement
- $345,000
- Total Project Cost
- $518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.