US231 SR75 over Bayou George

2.48mi N of CR2321 · County 005, Florida · Built 1995 · 2 Lanes · 15,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
460079
Year Built
1995
Length
99.1 m (325.1 ft)
Max Span
7.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
15,250
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.