CR 2321 over Deer Point Lake

3.2 Mi West US231/SR75 · County 005, Florida · Built 1957 · 2 Lanes · 9,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
464006
Year Built
1957
Length
438.9 m (1440 ft)
Max Span
9.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
9,300
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.