BROOKWOOD DRIVE over ROSE CREEK

0.2 MI E OF SR 47 · County 023, Florida · Built 1999 · 2 Lanes · 71 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

30.077017, -82.691525

This bridge is in worse condition than 74.1% of bridges in County 023. The average bridge in Florida is 0 years old; this one is 27 years old.

Nearby Bridges

Bridge Details

Structure #
294451
Year Built
1999
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
71
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.