CR-131 over I-75 (SR-93)

CR-131 / I-75 · County 023, Florida · Built 1962 · 2 Lanes · 950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
290037
Year Built
1962
Length
86.3 m (283.1 ft)
Max Span
26.5 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
950
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.