I-75 SB (SR-93) over US-90 (SR-10)

I-75 SB OVER US-90 · County 023, Florida · Built 1962 · 3 Lanes · 24,472 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
290061
Year Built
1962
Reconstructed
1995
Length
53.6 m (175.9 ft)
Max Span
14.6 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
24,472
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.