I-75 SB (SR-93) over CR-341

I-75 SB OVER CR-341 · County 023, Florida · Built 1962 · 3 Lanes · 27,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
290060
Year Built
1962
Reconstructed
1997
Length
62.5 m (205.1 ft)
Max Span
17.4 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
27,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.