SW 30TH AVE. over I-75 & SW 40TH BLVD.

0.3MI WEST OF SW 42ND ST · County 001, Florida · Built 2016 · 5 Lanes · 1,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
264877
Year Built
2016
Length
133.2 m (437 ft)
Max Span
48.5 m
Width
26.4 m (86.6 ft)
Lanes
5
Daily Traffic
1,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.