I-75 SB SR-93 over SR-121 & 331 WILLISTON R
I-75 SB at SR-121 · County 001, Florida · Built 1964 · 4 Lanes · 36,250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.601964, -82.373375
This bridge is in worse condition than 45.7% of bridges in County 001. The average bridge in Florida is 0 years old; this one is 62 years old.
Nearby Bridges
I-75 NB SR-93 over SR-121 & 331 WILLISTON R
Built 1964
I-75 NB (SR-93) over SR-24
Built 1964
I-75 SB (SR-93) over SR-24
Built 1964
SW 30TH AVE. over I-75 & SW 40TH BLVD.
Built 2016
I-75 SB (SR-93) over HOGTOWN CREEK
Built 1964
I-75 NB (SR-93) over HOGTOWN CREEK
Built 1964
SW 62ND BLVD over HOGTOWN CREEK
Built 2024
SW 20TH AVE over HOGTOWN CREEK
Built 1974
US-441 (SR-25) over TUMBLIN CREEK
Built 1957
CR-2074 (SW 20TH) over I-75 (SR-93)
Built 1964
Bridge Details
- Structure #
- 260063
- Year Built
- 1964
- Reconstructed
- 1994
- Length
- 61.9 m (203.1 ft)
- Max Span
- 15.8 m
- Width
- 20.3 m (66.6 ft)
- Lanes
- 4
- Daily Traffic
- 36,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.