I-75 NB SR-93 over SR-26 NEWBERRY ROAD
I-75 NB OVER SR-26 · County 001, Florida · Built 1964 · 3 Lanes · 52,250 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
29.659597, -82.418772
This bridge is in worse condition than 77.6% of bridges in County 001. The average bridge in Florida is 0 years old; this one is 62 years old.
Nearby Bridges
I-75 SB SR-93 over SR-26 NEWBERRY ROAD
Built 1964
NW 23RD AVE.C-3455 over I-75 (SR-93)
Built 1963
CR-2074 (SW 20TH) over I-75 (SR-93)
Built 1964
SW 20TH AVE over HOGTOWN CREEK
Built 1974
SW 62ND BLVD over HOGTOWN CREEK
Built 2024
I-75 NB (SR-93) over HOGTOWN CREEK
Built 1964
I-75 SB (SR-93) over HOGTOWN CREEK
Built 1964
SR-222(NW 39TH AV) over I-75 (SR-93)
Built 2001
SR-26A over HOGTOWN CREEK
Built 2006
SR-26 over HOGTOWN CREEK
Built 1957
Bridge Details
- Structure #
- 260082
- Year Built
- 1964
- Reconstructed
- 1994
- Length
- 78.3 m (256.9 ft)
- Max Span
- 20.4 m
- Width
- 17.9 m (58.7 ft)
- Lanes
- 3
- Daily Traffic
- 52,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.