I-75 SB SR-93 over SR-26 NEWBERRY ROAD

I-75 SB OVER SR-26 · County 001, Florida · Built 1964 · 4 Lanes · 52,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
260057
Year Built
1964
Reconstructed
1994
Length
78.3 m (256.9 ft)
Max Span
20.4 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
52,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.