I-75 NB Ramp A2 over SR-91 NB

7.5Mi N of CR-470 · County 119, Florida · Built 2019 · 1 Lanes · 20,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180082
Year Built
2019
Length
96.7 m (317.3 ft)
Max Span
49.1 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
20,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.