I-75 NB over SR-44

I-75 NB over SR-44 · County 119, Florida · Built 1994 · 4 Lanes · 52,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
180069
Year Built
1994
Length
65.8 m (215.9 ft)
Max Span
32.9 m
Width
27 m (88.6 ft)
Lanes
4
Daily Traffic
52,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$53,000
Total Project Cost
$135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.