I-75 NB over CR-470

I-75 NB over CR-470 · County 119, Florida · Built 2016 · 3 Lanes · 28,753 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 8 Very Good

Location

28.754283, -82.101453

This bridge is in worse condition than 56.6% of bridges in County 119. The average bridge in Florida is 0 years old; this one is 10 years old.

Nearby Bridges

Bridge Details

Structure #
180081
Year Built
2016
Length
53 m (173.9 ft)
Max Span
52.2 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
28,753
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.