CR-475 over Jumper Creek

CR-475 Over Jumper Creek · County 119, Florida · Built 2019 · 2 Lanes · 6,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

28.696111, -82.109278

This bridge is in worse condition than 56.6% of bridges in County 119. The average bridge in Florida is 0 years old; this one is 7 years old.

Nearby Bridges

Bridge Details

Structure #
184114
Year Built
2019
Length
22.9 m (75.1 ft)
Max Span
7.6 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
6,600
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.