SR-471 over Canal

10 Mi. South of SR-50 · County 119, Florida · Built 1966 · 2 Lanes · 4,300 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
180013
Year Built
1966
Length
9.4 m (30.8 ft)
Max Span
3 m
Lanes
2
Daily Traffic
4,300
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$30,000
Total Project Cost
$163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.