SR-50 EB over Little Withlacoochee R.

SR-50-L.Withlacoochee · County 119, Florida · Built 2022 · 2 Lanes · 3,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180083
Year Built
2022
Length
76.2 m (250 ft)
Max Span
15.2 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
3,550
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.