I-75 SB (SR-93) over SALT CREEK

3.3 MI S OF SR-681 · County 115, Florida · Built 2012 · 6 Lanes · 46,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
170177
Year Built
2012
Length
100.9 m (331 ft)
Max Span
30.5 m
Width
18 m (59.1 ft)
Lanes
6
Daily Traffic
46,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.