I-75 NB (SR-93) over SALT CREEK

1.1 Mi N of SR-762 · County 115, Florida · Built 1979 · 3 Lanes · 46,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
170108
Year Built
1979
Reconstructed
2012
Length
100.6 m (330.1 ft)
Max Span
20.1 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
46,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.