CR-37B over DEERFIELD CREEK

1.0 MI N/O LAKE MIRIAM DR · County 105, Florida · Built 2011 · 5 Lanes · 23,500 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
164534
Year Built
2011
Length
7 m (23 ft)
Max Span
2.1 m
Lanes
5
Daily Traffic
23,500
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.