SR 570 POLK EB 7.2 over CLEVELAND HEIGHTS BLVD

7.3 MI EAST OF I-4 WEST · County 105, Florida · Built 1998 · 2 Lanes · 21,350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
160260
Year Built
1998
Length
38.2 m (125.3 ft)
Max Span
38.2 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
21,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.