I-4 EB (SR-400) over SR-33 (LAKELAND HILLS B
3.4 MI W/O SR-570 · County 105, Florida · Built 1961 · 3 Lanes · 47,750 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
28.140308, -81.8985
This bridge is in worse condition than 73% of bridges in County 105. The average bridge in Florida is 0 years old; this one is 65 years old.
Nearby Bridges
I-4 WB (SR-400) over SR-33 (LAKELAND HILLS BL
Built 1961
SR-33 over PIT CREEK
Built 1940
SR-33 over FORK CREEK
Built 1940
SR-33 over QUAIL CREEK
Built 1940
SR 570 POLK 24.3 over I-4/SR400
Built 1999
SR570 POLK EB 24.3 over I-4 SR 400
Built 1999
OLD COMBEE RD over I-4 (SR-400)
Built 2004
SR 570 POLK 22.9 over PACE RD
Built 2011
SR 570 POLK 22.9 over PACE RD
Built 1999
MT OLIVE CHURCH RD over I-4 (SR-400)
Built 2004
Bridge Details
- Structure #
- 160182
- Year Built
- 1961
- Reconstructed
- 2004
- Length
- 68 m (223.1 ft)
- Max Span
- 18.6 m
- Width
- 18.6 m (61 ft)
- Lanes
- 3
- Daily Traffic
- 47,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.