MT OLIVE CHURCH RD over I-4 (SR-400)
0.4 MI EAST OF SR-570 · County 105, Florida · Built 2004 · 2 Lanes · 4,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
28.155667, -81.841806
This bridge is in worse condition than 32.6% of bridges in County 105. The average bridge in Florida is 0 years old; this one is 22 years old.
Nearby Bridges
SR570 POLK EB 24.3 over I-4 SR 400
Built 1999
SR 570 POLK 24.3 over I-4/SR400
Built 1999
I-4 EB (SR-400) over CR-655 (BERKLEY RD.)
Built 1961
I-4 WB (SR-400) over CR-655 (BERKLEY RD.)
Built 1961
SR 570 POLK 22.9 over PACE RD
Built 2011
SR 570 POLK 22.9 over PACE RD
Built 1999
SR-33 over CR-655
Built 1949
SR-33 over QUAIL CREEK
Built 1940
SR-559 over I-4 (SR-400)
Built 2016
SR-33 over KELLY L SLOUGH
Built 1939
Bridge Details
- Structure #
- 160324
- Year Built
- 2004
- Length
- 101.8 m (334 ft)
- Max Span
- 50.9 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.