LEELAND STREET S. over POINT BRITTANY CHANNEL

.2MI S OF PINELLAS BAYWAY · County 103, Florida · Built 1965 · 2 Lanes · 1,050 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
157128
Year Built
1965
Reconstructed
2003
Length
45.9 m (150.6 ft)
Max Span
9.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,050
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.