I-75 (SR-93) SB over SR-70

3.5Mi South of SR-64 · County 081, Florida · Built 2020 · 4 Lanes · 70,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
130155
Year Built
2020
Length
72.5 m (237.9 ft)
Max Span
36.3 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
70,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.