I-75 NB over SR-70

3.5Mi South of SR-64 · County 081, Florida · Built 2019 · 3 Lanes · 66,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
130154
Year Built
2019
Length
72.5 m (237.9 ft)
Max Span
36.3 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
66,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.