CR-765 NB over Gator Slough Canal
4.0 MI N/O SR-78 · County 071, Florida · Built 2017 · 3 Lanes · 20,401 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
26.694389, -82.039111
This bridge is in worse condition than 26.1% of bridges in County 071. The average bridge in Florida is 0 years old; this one is 9 years old.
Nearby Bridges
CR765-BURNT STORE over GATOR SLOUGH CANAL
Built 1972
CR765(BURNT ST RD) over ARROZ CANAL
Built 1972
CR-765 NB over Arroz Canal
Built 2017
NW 28TH AVE. over TYRE CANAL
Built 1975
EL DORADO BLVD. over GATOR SLOUGH
Built 1983
CR-765 NB over Horseshoe Canal
Built 2017
OLD BURNT ST RD SB over GATOR SLOUGH
Built 1983
CR-765/BURNT STORE over HORSESHOE CANAL
Built 1972
OLD BURNT ST RD NB over GATOR SLOUGH
Built 1983
EL DORADO BLVD. over HORSESHOE CANAL
Built 1975
Bridge Details
- Structure #
- 124140
- Year Built
- 2017
- Length
- 69.6 m (228.3 ft)
- Max Span
- 23.2 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 3
- Daily Traffic
- 20,401
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.