CR-765 NB over Arroz Canal

3.6 MI N/O SR-78 · County 071, Florida · Built 2017 · 3 Lanes · 8,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
124139
Year Built
2017
Length
46.4 m (152.2 ft)
Max Span
23.2 m
Width
22.4 m (73.5 ft)
Lanes
3
Daily Traffic
8,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.