BONITA GRAND DR over BONITA CREEK
0.25MI N of BONITA BCH RD · County 071, Florida · Built 1983 · 2 Lanes · 6,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.338856, -81.738575
This bridge is in worse condition than 28.4% of bridges in County 071. The average bridge in Florida is 0 years old; this one is 43 years old.
Nearby Bridges
I-75 NB (SR 93) over IMPERIAL RIVER
Built 1980
I-75 over IMPERIAL RIVER RELIEF
Built 1979
I-75 SB (SR 93) over IMPERIAL RIVER
Built 1980
I-75 NB (SR 93) over SR 865 (BONITA BCH RD)
Built 1981
I-75 SB (SR 93) over SR 865 (BONITA BCH RD)
Built 1981
EAST TERRY STREET over I-75
Built 1981
IMPERIAL STREET over IMPERIAL RIVER
Built 2007
IMPERIAL PKY/WAGON over NEW CANAL
Built 1996
CR 887 over OAK CREEK
Built 1960
MATHESON AVENUE over IMPERIAL RIVER
Built 1975
Bridge Details
- Structure #
- 124119
- Year Built
- 1983
- Length
- 13.1 m (43 ft)
- Max Span
- 6.7 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,800
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.