EAST TERRY STREET over I-75

1 MI. N of CR 865 · County 071, Florida · Built 1981 · 2 Lanes · 11,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
120145
Year Built
1981
Length
79.6 m (261.2 ft)
Max Span
39.8 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
11,100
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.