SWFIA TERMINAL ACC over BEN HILL GRIFFIN PRKY

0.5 MI E of I-75 (SR-93) · County 071, Florida · Built 2015 · 4 Lanes · 27,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
120185
Year Built
2015
Length
51.2 m (168 ft)
Max Span
51.2 m
Width
28.7 m (94.2 ft)
Lanes
4
Daily Traffic
27,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.