SWFIA TERMINAL ACC over I-75

0.5 MI W/O BEN HILL GRIFF · County 071, Florida · Built 2014 · 2 Lanes · 22,500 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
120179
Year Built
2014
Length
132.4 m (434.4 ft)
Max Span
40.9 m
Width
25.9 m (85 ft)
Lanes
2
Daily Traffic
22,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.