SR618 EB to I-4 EB over CSX RR SR-618 & SR-60
0.4MI E OF 22ND ST (US41B · County 057, Florida · Built 2013 · 2 Lanes · 2,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
27.952842, -82.425844
This bridge is in worse condition than 22.5% of bridges in County 057. The average bridge in Florida is 0 years old; this one is 13 years old.
Nearby Bridges
NB 22 ST to EB I-4 over CSX RR SR-618 & SR-60
Built 2013
SR618 SELMON WB over CSX RAILROAD
Built 1981
SR-618A SELMON over CSX RAILROAD
Built 2005
SR618 SELMON EB over CSX RAILROAD
Built 2005
I-4 WB to 22 St SB over CSX RR SR-618 & SR-60
Built 2013
XTOWN (SR-618) WB over RAMP E AND CSX RAILROAD
Built 2013
RAMP K over CSX RR & SR-60
Built 2013
SR618 EB to I-4 WB over CSX RR SR-618 & SR-60
Built 2013
ACCESS ROAD over 34TH STEET CANAL
Built 2014
SR618 WB to I-4 WB over CSX RR SR 60 & 34TH ST
Built 2013
Bridge Details
- Structure #
- 100717
- Year Built
- 2013
- Length
- 810.1 m (2657.8 ft)
- Max Span
- 79 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 2,100
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.