NB 22 ST to EB I-4 over CSX RR SR-618 & SR-60

0.4MI E OF 22ND ST(US41B) · County 057, Florida · Built 2013 · 1 Lanes · 9,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100715
Year Built
2013
Length
856.7 m (2810.7 ft)
Max Span
79.5 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
9,250
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.