I-275 NB over MACDILL AVE.

0.8 MI. E OF DALE MABRY · County 057, Florida · Built 2009 · 5 Lanes · 104,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
100695
Year Built
2009
Length
32.9 m (107.9 ft)
Max Span
32.9 m
Width
26.5 m (86.9 ft)
Lanes
5
Daily Traffic
104,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.